Difference between revisions of "Reddy Update"

From IntRoLab
(Schedule)
(Schedule)
Line 4: Line 4:
 
|-
 
|-
 
| Week 31, July 27 - August 1
 
| Week 31, July 27 - August 1
| Hello
+
|  
 +
* Ordered new coupling for shoulder
 +
* Fab. head mechanism for gravity assist
 +
* Assembly of 1 motor PCB,
 
|-
 
|-
 
| Week 32, August 3 - August 9  
 
| Week 32, August 3 - August 9  
| Hello
+
|  
 +
*
 +
*
 +
*
 
|}
 
|}
  

Revision as of 12:58, 28 July 2009

Schedule

Week 31, July 27 - August 1
  • Ordered new coupling for shoulder
  • Fab. head mechanism for gravity assist
  • Assembly of 1 motor PCB,
Week 32, August 3 - August 9

Head Improvements

Motor Improvements

Tuning the motor controller

RS-232 protocol enhancements

CAN command added

Future Improvements

  • Single 12V power supply could be useful for direct connection to Pioneer robots. A 12V-->8.5V DC-DC (100W) converter is required for this operation. This item can be ordered at Vicor. 8.5V batteries would then be useless.

Additional Notes

Documents